Design & Build of Rerouting of Existing Chilled Water Pipe at Sector E48 at Abu Dhabi.
Location: Abu Dhabi, United Arab Emirates Client: Musanada / Tabreed Value: Under $25M Timeline: 12 months Scope: Design & Build of Rerouting of Existing Chilled Water Pipe at Sector E48 in Abu Dhabi.Supply & Installation of dia 500mmx480m Pre-insulated PL FOC cables. Isolation Valve Chambers 2Nos. & all accessories. 4 Nos. Hot Tapping & flow […]
AD08- Central Market Qasr Al Hosn, Abu Dhabi, UAE – External Chilled Water Piping Network and ETS
Location: Abu Dhabi, United Arab Emirates Client: Tabreed Value: Under $25M Timeline: 14 months Scope: AD08- Central Market Qasr Al Hosn, Abu Dhabi, UAE – External Chilled Water Piping Network and ETS Hot Tap from existing Tabreed Network to ETS Room in addition to the Primary Side of the ETS. Unique Challenge: Work in busy […]
Flow line & Transfer Line Installation Works Incl. Rerouting / Demolition of Existing Flow lines related to EPC for Asab FFD Project
Location: ASAB, United Arab Emirates Client: Petrofac / ADNOC Value: $75M – $250M Timeline: 62 months Scope: Flow Line & Transfer Line Installation Works Incl. Rerouting / Demolition of Existing Flow lines related to EPC for the Asab FFD Project Installation of 51 Km of Pipelines (16 to 30 Inch dia) Pipelines, 136 Km of […]
Supply of Gas to New Al Ain Cement Plant for Arkan
Location: Al Ain, United Arab Emirates Client: NPCC Value: $25M – $75M” Timeline: 7 months Scope: Supply of Gas to New Al Ain Cement Plant for ArkanInstallation of 47.5 Kms of 20 Inch Dia Gas Pipeline with Launcher and Receiver Faculties, Mainline Valve Stations, Pressure Reducing Station, and Gas Filters. Unique Challenge: Cross-country pipeline […]
9090 DIYAB GEP Mechanical, Piping works, Valves, Support List, E&I Works and Civil Works
Location: Al Ruwais, United Arab Emirates Client: Woodlands Energy Services LLC (“WoodServ”) / TOTALEnergies Value: Under $25M Timeline: 15 months Scope: 9090 DIYAB GEP Mechanical, Piping works, Valves, Support List, E&I Works, and Civil Works.The mechanical scope (equipment/piping/valve) Installation & Erection including but not limited to the skid packaged vendor items, and the interfaces/Interconnections within […]
Diyab Gas Export Pilot Project (TOTAL Unconventional Gas) The Installation of 8” CS Pipeline
Location: Al Ruwais, United Arab Emirates Client: TOTAL Energies Value: $25M – $75M Timeline: 18 months Scope: Diyab Gas Export Pilot Project (TOTAL Unconventional Gas) The Installation of 8” CS Pipeline; to install a new 8”(length of approx. 35Km) gas pipeline from EPF to the tie-in location at the Beach Valve Station to make use […]