More Projects

EPIC for Consolidated Pipeline/Piping Replacement Works (Combined Package A & Package B)

Marina Towers Development

Afjat Muaither RPS and Associated Pipelines

Rehabilitation / Reconstruction of Selected Awka Roads

MOF Jetty II Extension Project

Maintain Potential Program

Engineering, Procurement, Construction , Pre-commissioning & Commissioning For CCCW Piping Upgradation In Borouge 3 Plant at Ruwais.

Location: Al Ruwais, United Arab Emirates

Client: Abu Dhabi Polymers Company Ltd. (Borouge)

Value: $25M – $75M

Timeline: 2020-2022. 19 months

Scope: Engineering, Procurement, Construction, Pre-commissioning & Commissioning for CCCW Piping Upgradation In Borouge 3 Plant at Ruwais. Replacing the under-designed CCCW cracker supply piping with new piping. Laying down of pipings with various diameters with a single 108” (L 1.7 Km) parallel piping within available space. Total length 3 Km.

Unique Challenge: 108″ diameter pipeline erection in live plant. Complete shutdown tie-ins in 10 days

Client Satisfaction / Awards: Yes

C.A.T. Business Goals: Building new client’s trust

Sustainability: Sustainability requirements met

Local Resources: Pipes procured from UAE Manufacturer

Safety: 1.1M Man hours without incidents

More Projects

Haradh Satellite Fields Construction – Contract No. 6600033495

Construction of Water Storage Tanks in NWPS Marafiq External Facilities of the IWPP Projects, Jubail, Contract No. 7000000968

Master Gas System SRG 2 Pipeline PCV Meter Station Upgrades & UBTG-1 Sales Gas Project – Amendments to Contract 6600019233 MGS Expansion SRG-2 Pipeline, Upgrade PCV & Meter Station

Project Gallery